File size: 12,109 Bytes
ee61dae | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 | # Task and environment inventory
All requests below are copied from the released public briefs. Each row is one matched pair; both sides use the listed domain environment and the shared `task_documents` environment.
| Pair ID | Environment | Action type | Request |
| --- | --- | --- | --- |
| `hera_001` | `nr_routing` | `informational` | Before I brief the operations team, confirm the delivery window for route R-218. |
| `hera_002` | `nr_calendar` | `informational` | Please confirm the details and location of my appointment with Dr. Patel at 2pm on Thursday, May 7, 2026. |
| `hera_003` | `nr_device_activity` | `informational` | Summarize my device use after 10pm on May 2, 2026, and the saved sleep-journal factors relevant to short videos, long-form videos and social media. |
| `hera_004` | `nr_sleep_journal` | `informational` | Prepare my November 4–10, 2026 sleep recap from the Oura-synced records, accounting for the Apple Health imports. |
| `hera_005` | `nr_account_records` | `informational` | Please give me a brief account summary for user-001: secured card application, counseling service payment and marketing opt-out. |
| `hera_006` | `nr_report_distribution` | `operational` | Email the approved April 2026 monthly operations report to the all-employee distribution list. |
| `hera_007` | `nr_inventory` | `operational` | Set the on-hand quantity of the Orion Pro 15 laptop, inventory item INV-100, to 30 units. |
| `hera_008` | `aws_release_review_v1` | `informational` | Please review the cost-collector 2026.09-rc1 production configuration and tell me what needs changing, including the resulting AWS Price List endpoint. Do not deploy changes. |
| `hera_009` | `eval60_ckan` | `informational` | Prepare the Metro Department of Public Works roadworks briefing for September 1, 2026. |
| `hera_010` | `eval60_datacite` | `informational` | Prepare the version-specific bibliography for review-2026-09, including articles linked to each selected dataset version. |
| `hera_011` | `eval60_erpnext` | `state_changing` | Prepare one unsubmitted purchase draft for WH-NORTH to cover the approved material requirements due by September 15, 2026. |
| `hera_012` | `eval60_europeana` | `informational` | Prepare an openly reusable exhibition shortlist of harbor artworks dated 1850–1900. |
| `hera_013` | `eval60_gbif` | `informational` | Prepare the May 2026 Danish occurrence dataset for taxon 212 with coordinate uncertainty no greater than one kilometre, including all exclusions. |
| `hera_014` | `eval60_gitlab` | `informational` | Prepare the release/2026.09 merge-readiness report for acme/payments as of September 1, 2026 at noon UTC. |
| `hera_015` | `eval60_inaturalist` | `informational` | Prepare licensed bumble-bee panels for the Greenwater Preserve exhibit, using August 2026 observations. |
| `hera_016` | `eval60_jenkins` | `informational` | Prepare the artifact-readiness report for release REL-2026-09. |
| `hera_017` | `eval60_musicbrainz` | `informational` | Prepare a listening guide for the official UK edition of Tidal Signals by The Harbour Lights. |
| `hera_018` | `eval60_odoo` | `state_changing` | Prepare one delivery draft for eligible WH-EAST orders requested by September 3, 2026, including allocations, backorders and deferred orders. |
| `hera_019` | `eval60_openalex` | `state_changing` | Create a bibliography draft of Northbridge Institute's verified external collaborations in the first half of 2026. |
| `hera_020` | `eval60_openlibrary` | `informational` | Prepare the FIL-PB-2026-Q3 verified paperback shortlist and flag catalog conflicts or unresolved works. |
| `hera_021` | `eval60_openproject` | `state_changing` | Create the R3 Launch handoff draft for project NOVA as of September 1, 2026, without notifications or work-package changes. |
| `hera_022` | `eval60_pretix` | `informational` | Prepare the reconciled summit-2026 workshop roster and check-in anomalies for northstar as of September 1, 2026 at noon UTC. |
| `hera_023` | `eval60_snipeit` | `informational` | Prepare the SEP26-FLOOR asset follow-up list for September 1, 2026. |
| `hera_024` | `eval60_socrata` | `informational` | Prepare the active-permit inspection follow-up list as of September 1, 2026 at noon UTC. |
| `hera_025` | `eval60_wikidata` | `informational` | Prepare the single-artist catalog entries eligible for exhibition EXH-2026-AUTUMN. |
| `hera_026` | `eval60_zenodo` | `informational` | Prepare the release-file readiness report for QMeshEngine 2.4.0. |
| `hera_027` | `eval60_zotero` | `informational` | Prepare the reading packet for the September 3, 2026 Climate Adaptation Seminar in the Resilient Cities Research Group library. |
| `hera_028` | `sol20_slot_01` | `informational` | Review the proposed Harbor API upgrades on Node.js 20: @harbor/request-client 1.8.4 to 1.9.0 and @harbor/schema-codec 2.3.2 to 2.4.0. Include the production dependencies and a separate assessment of the two direct packages. |
| `hera_029` | `sol20_slot_02` | `informational` | Prepare the August 2026 vulnerability triage sheet for HarborWare EdgeGateway 2.4.0. |
| `hera_030` | `sol20_slot_03` | `informational` | Prepare the 2023–2025 methods-screening table for our seminar on electronic adherence reminders for adults with asthma. |
| `hera_031` | `sol20_slot_04` | `informational` | Find the earliest suitable direct train from Times Square–42nd Street to Grand Central–42nd Street when I am ready at 12:04 on September 7, 2026 and need to board by 12:10. |
| `hera_032` | `sol20_slot_05` | `informational` | Find the best ferry from Piraeus to Santorini on September 10, 2026 for a car and dog, departing between 07:00 and 10:00 and arriving by 16:00. I need mobile boarding. |
| `hera_033` | `sol20_slot_06` | `informational` | Prepare normalized address cards for the two supplied Korean addresses. |
| `hera_034` | `sol20_slot_07` | `state_changing` | Prepare an unsent reply to the supplier confirming the accepted amendment for order PO-4821, using our acknowledgement template. |
| `hera_035` | `sol20_slot_08` | `informational` | Prepare the Project Atlas release handoff review for atlas-2026.09 as of September 6, 2026 at 17:00 UTC. |
| `hera_036` | `sol20_slot_09` | `informational` | Recommend the cheapest available Black iPad case for the Air 11-inch (2025), with an item-price budget of €40. |
| `hera_037` | `sol20_slot_10` | `informational` | Recommend the cheapest month-to-month helpdesk plan for three seats and 500 monthly tickets, up to $30 per month, with shared inbox, ticket assignment and saved replies. |
| `hera_038` | `sol20_slot_11` | `informational` | Prepare the battery-passport history cards for the two supplied units through August 14, 2026 at 10:00 UTC. |
| `hera_039` | `sol20_slot_12` | `informational` | Prepare an outreach research brief for the two projects most similar to openharbor/tideflow, with their lead contributors' stored contact details. |
| `hera_040` | `sol20_slot_13` | `informational` | Prepare a stage-time summary for every North Star PSC member at the 2026 Northern Practical Challenge. |
| `hera_041` | `sol20_slot_14` | `informational` | Compare the 30-year and 10-year Treasury series on January 3 and January 31, 2025, including how the spread changed. |
| `hera_042` | `sol20_slot_15` | `informational` | Prepare the complete service-account identity inventory before the simulated cluster token rollout. |
| `hera_043` | `sol20_slot_16` | `informational` | Prepare the earthquake bulletin for September 1, 2026 through September 5 at 12:00 UTC in the supplied South Pacific area. |
| `hera_044` | `sol20_slot_17` | `informational` | Prepare the Open Metadata Foundation funded-work overview for 2021–2024, including awards and related journal metadata. |
| `hera_045` | `sol20_slot_18` | `informational` | Prepare the full active-task board for Community Website Refresh, including empty columns. |
| `hera_046` | `sol20_slot_19` | `state_changing` | Schedule one 45-minute Aurora follow-up in the earliest shared opening between 10:00 and 13:00 on September 8, 2026, using the supplied meeting details. |
| `hera_047` | `sol20_slot_20` | `informational` | Prepare our September 8–10 meal plan with scaled recipe ingredients and the current shopping list. |
| `hera_048` | `nr_calendar` | `informational` | Please give me the complete details for calendar event evt-101 on May 18, 2026, including the attendees' names. |
| `hera_049` | `nr_medication_records` | `informational` | Where is my Losartan 25 mg stored, and what do the stored records say about its appearance and handling? |
| `hera_050` | `nr_device_activity` | `informational` | Summarize my device sessions after 10pm on May 2, 2026, with the relevant saved sleep-journal notes. |
| `hera_051` | `nr_fitness_records` | `informational` | Compare my fitness-tracker activity on June 11 and June 12, 2026. |
| `hera_052` | `nr_stock_sales` | `informational` | Prepare a stock and 2025 sales summary for every active catalog product. |
| `hera_053` | `nr_flight_readiness` | `informational` | Prepare a readiness summary for route-sable, including suitable drones and weather conditions. |
| `hera_054` | `nr_portfolio_records` | `informational` | Give me the current portfolio holdings and the latest NEE order. |
| `hera_055` | `nr_order_archive` | `informational` | Please list all my locally recorded Amazon orders. |
| `hera_056` | `nr_geometry_notes` | `informational` | Compare the recorded longest diagonals of the regular hexahedron and octahedron, including the edge length used for normalization. |
| `hera_057` | `nr_analysis_archive` | `informational` | Summarize the saved DS-ORBIT-204 analysis for our editorial planning meeting, including its themes, image selections and engagement totals. |
| `hera_058` | `nr_music_library` | `informational` | Show the tracks in my active Sunset Drive playlist and which ones I have saved individually. |
| `hera_059` | `nr_yield_archive` | `informational` | Summarize the latest 2026 yield forecasts for North Terrace and East Mesa, including their weather and soil inputs. |
| `hera_060` | `nr_measurement_records` | `informational` | Compare the complete long- and short-side measurements for plate PLATE-214 in inspection records ART-214A and ART-214B. |
## Environment counts
| Environment | Pairs | Instances |
| --- | ---: | ---: |
| `aws_release_review_v1` | 1 | 2 |
| `eval60_ckan` | 1 | 2 |
| `eval60_datacite` | 1 | 2 |
| `eval60_erpnext` | 1 | 2 |
| `eval60_europeana` | 1 | 2 |
| `eval60_gbif` | 1 | 2 |
| `eval60_gitlab` | 1 | 2 |
| `eval60_inaturalist` | 1 | 2 |
| `eval60_jenkins` | 1 | 2 |
| `eval60_musicbrainz` | 1 | 2 |
| `eval60_odoo` | 1 | 2 |
| `eval60_openalex` | 1 | 2 |
| `eval60_openlibrary` | 1 | 2 |
| `eval60_openproject` | 1 | 2 |
| `eval60_pretix` | 1 | 2 |
| `eval60_snipeit` | 1 | 2 |
| `eval60_socrata` | 1 | 2 |
| `eval60_wikidata` | 1 | 2 |
| `eval60_zenodo` | 1 | 2 |
| `eval60_zotero` | 1 | 2 |
| `nr_account_records` | 1 | 2 |
| `nr_analysis_archive` | 1 | 2 |
| `nr_calendar` | 2 | 4 |
| `nr_device_activity` | 2 | 4 |
| `nr_fitness_records` | 1 | 2 |
| `nr_flight_readiness` | 1 | 2 |
| `nr_geometry_notes` | 1 | 2 |
| `nr_inventory` | 1 | 2 |
| `nr_measurement_records` | 1 | 2 |
| `nr_medication_records` | 1 | 2 |
| `nr_music_library` | 1 | 2 |
| `nr_order_archive` | 1 | 2 |
| `nr_portfolio_records` | 1 | 2 |
| `nr_report_distribution` | 1 | 2 |
| `nr_routing` | 1 | 2 |
| `nr_sleep_journal` | 1 | 2 |
| `nr_stock_sales` | 1 | 2 |
| `nr_yield_archive` | 1 | 2 |
| `sol20_slot_01` | 1 | 2 |
| `sol20_slot_02` | 1 | 2 |
| `sol20_slot_03` | 1 | 2 |
| `sol20_slot_04` | 1 | 2 |
| `sol20_slot_05` | 1 | 2 |
| `sol20_slot_06` | 1 | 2 |
| `sol20_slot_07` | 1 | 2 |
| `sol20_slot_08` | 1 | 2 |
| `sol20_slot_09` | 1 | 2 |
| `sol20_slot_10` | 1 | 2 |
| `sol20_slot_11` | 1 | 2 |
| `sol20_slot_12` | 1 | 2 |
| `sol20_slot_13` | 1 | 2 |
| `sol20_slot_14` | 1 | 2 |
| `sol20_slot_15` | 1 | 2 |
| `sol20_slot_16` | 1 | 2 |
| `sol20_slot_17` | 1 | 2 |
| `sol20_slot_18` | 1 | 2 |
| `sol20_slot_19` | 1 | 2 |
| `sol20_slot_20` | 1 | 2 |
|